A double girder bridge crane is an essential piece of equipment in modern warehouses, providing efficient and reliable handling of heavy materials and goods. This type of crane consists of two parallel girders that support the trolley and hoist, offering enhanced stability and load capacity compared to single girder cranes. In this guide, we will explore how to effectively apply a double girder bridge crane in a warehouse setting, covering aspects such as planning, installation, operation, and maintenance.

Planning and Design
Assessing Warehouse Requirements
Before implementing a double girder bridge crane, it’s crucial to assess the specific requirements of the warehouse. Consider factors such as the types of materials to be handled, the weight and dimensions of loads, the frequency of use, and the layout of the warehouse. Understanding these requirements will help in selecting the appropriate crane specifications, such as load capacity, span, and lifting height.
Structural Considerations
The structural integrity of the warehouse must be evaluated to ensure it can support the installation of a double girder bridge crane. This includes examining the building’s columns, beams, and roof structure. In some cases, reinforcement may be necessary to accommodate the additional loads imposed by the crane system. Consulting with a structural engineer is recommended to ensure safety and compliance with local building codes.
Selecting the Right Crane
Double girder bridge cranes come in various configurations and capacities. Based on the warehouse assessment, choose a crane that meets the operational needs. Key specifications to consider include:
Load capacity: Ensure the crane can handle the maximum weight of the loads.
Span: The distance between the crane runways, which should match the width of the warehouse.
Lifting height: The vertical distance the hoist can travel, ensuring it accommodates the height of the warehouse and the required lifting operations.
Duty cycle: The frequency and duration of use, which determines the crane’s classification and durability.
Installation
Preparing the Site
Proper site preparation is essential for the successful installation of a double girder bridge crane. This includes clearing the installation area, ensuring a level and stable foundation, and marking the positions for the crane runways and supporting columns.
Installing the Runways
The runways, which support the crane’s movement along the length of the warehouse, must be installed with precision. These tracks are typically mounted on top of the warehouse’s structural beams or supported by additional columns. Accurate alignment and leveling of the runways are critical to ensure smooth and safe crane operation.
Assembling the Crane
Once the runways are in place, the assembly of the double girder bridge crane can begin. This process involves:
Erecting the girders: The two parallel girders are lifted into position and secured to the end trucks, which allow the crane to travel along the runways.
Installing the trolley and hoist: The trolley, which houses the hoist, is mounted on the girders. The hoist is responsible for lifting and lowering loads.
Electrical and control systems: Wiring and control systems are installed to enable the operation of the crane. This includes power supply connections, control panels, and safety devices.
Testing and Commissioning
After installation, thorough testing and commissioning are essential to ensure the crane operates safely and efficiently. This includes load testing to verify the crane’s capacity, checking the alignment of the runways and girders, and testing the functionality of all control systems and safety features.

Operation
Training and Certification
Operating a double girder bridge crane requires skilled personnel who are trained and certified in crane operation. Training programs should cover topics such as:
Crane components and functions: Understanding the parts of the crane and their roles.
Operating procedures: Safe and efficient methods for lifting, moving, and placing loads.
Safety protocols: Identifying and mitigating potential hazards, and responding to emergencies.
Safe Operating Practices
Implementing safe operating practices is crucial to prevent accidents and ensure the longevity of the crane. Some key practices include:
Regular inspections: Conduct pre-operation checks to ensure the crane is in good working condition.
Load handling: Always follow the manufacturer’s guidelines for load capacity and distribution. Avoid sudden movements and ensure loads are securely attached before lifting.
Communication: Use clear signals or communication devices to coordinate movements with other workers in the warehouse.
Maintenance
Routine Maintenance
Regular maintenance is essential to keep the double girder heavy duty bridge crane in optimal condition. This includes:
Lubrication: Regularly lubricate moving parts to reduce friction and wear.
Inspections: Conduct routine inspections of critical components such as the hoist, trolley, girders, and runways. Look for signs of wear, damage, or misalignment.
Cleaning: Keep the crane and its components clean to prevent the buildup of dust and debris, which can affect performance.
Preventive Maintenance
In addition to routine maintenance, a preventive maintenance program should be established. This involves scheduled maintenance tasks based on the crane’s usage and recommendations of manufacturer. Key aspects of preventive maintenance include:
Component replacement: Replace worn or damaged parts before they fail.
System checks: Perform detailed checks on electrical systems, control panels, and safety devices.
Record keeping: Maintain detailed records of all maintenance activities, including inspections, repairs, and replacements. This helps in tracking the crane’s condition and planning future maintenance.
Professional Servicing
While routine and preventive maintenance can be performed by trained warehouse staff, it’s important to schedule regular servicing by professional technicians. Professional servicing ensures that complex components and systems are thoroughly inspected and maintained, reducing the risk of unexpected breakdowns and extending the crane’s lifespan.
A double girder bridge crane is a powerful tool for enhancing efficiency and productivity in a warehouse. By carefully planning the installation, providing proper training and certification for operators, and implementing regular maintenance, warehouses can maximize the benefits of this equipment while ensuring safe and reliable operations. Whether lifting heavy materials, moving bulky goods, or streamlining workflows, a double girder bridge crane is an invaluable asset for modern warehousing.